TwitterFacebooksen



Searching for details:

The author of this page will appreciate comments, corrections and imagery related to the subject. Please contact Anatoly Zak.

Related pages:

Progress cargo ship

 

Progress M-26M mission

The Progress M-26M cargo ship became the first Russian vehicle to fly to the International Space Station, ISS, in 2015 to re-supply Expedition 42 onboard the outpost. After several delays, the launch took place on February 17.

Soyuz rocket with Progress M-26M spacecraft lifts off on Feb. 17, 2015.

insertion

Ground track and launch profile for Progress M-26M mission on Feb. 17, 2015.

From the publisher: Pace of our development depends primarily on the level of support from our readers!
Donate

Mission background

Preparations of the Progress M-26M spacecraft for launch started at the Baikonur Cosmodrome in the middle of August 2014. This launch was previously scheduled for Oct. 23, 2014, however it was later postponed to Feb. 3, 2015. By the beginning of that year, the mission was rescheduled for February 17.

The Soyuz-U rocket for the mission arrived at Baikonur on December 12, 2014. On February 3, the cargo ship was cleared for irreversable operations and a day later shipped to a fueling station at Site 31. The spacecraft was returned to its processing building at Site 254 on February 6. Five days later, it was integrated with the transfer ring of the launch vehicle and on February 12, the spacecraft was covered with its payload fairing. Next day, the payload section was transferred from Site 254 to an assembly building at Site 112, where it was integrated with its Soyuz-U launch vehicle. The rollout to the launch pad at Site 1 took place on the morning of February 15.

Launch and ride to orbit

The liftoff of the Soyuz-U rocket took place as scheduled on Feb. 17, 2015, at 14:00:17 Moscow Time (6:00 a.m. EST, 11:00 GMT) from Pad No. 5 at Site 1 in Baikonur. The launch vehicle carried the 7,287-kilogram Progress M-26M spacecraft bound to the International Space Station, ISS. Following a standard ascent, the spacecraft separated from the third stage of the launch vehicle at 14:09:06 Moscow Time (6:09 a.m. EST, 09:09 GMT) in a 192.7 by 246.3-kilometer orbit with an inclination 51.65 degrees toward the Equator, the mission control in Korolev confirmed.

The deployment of external structures onboard the spacecraft was confirmed along the following timeline:

  • Deployment of antennas of the radio communications system, RTS, at 14:09:22 Moscow Time;
  • A pair of solar panel deployment: 14:09:27 Moscow Time;
  • Deployment of the rendezvous antennas: 14:09:35 Moscow Time.

Rendezvous and docking

Progress M-26M followed a six-hour, five-revolution rendezvous profile with the outpost, aiming to achieve docking at 19:58:59 Moscow Time (11:58 EST, 16:58 GMT) on the day of the launch at the aft port of the Zvezda Service Module, SM on the Russian segment. At the moment of the rendezvous with the cargo ship, the space station was expected to be in a 398.25 by 421.47-kilometer orbit.

To reach the outpost, Progress M-26M was scheduled to conduct four orbit-boosting engine firings, two during the mission's first revolution around the Earth and two more during the second orbit:

Moscow time
Orbit
Delta V
Burn duration
Resulting orbit after each maneuver
Period
Inclination
Perigee
Apogee
14:43:11
1
11.75 m/s
30.4 seconds
88.99 minutes
51.65 degrees
215.5 kilometers
253.1 kilometers
15:09:41
1
13.58 m/s
34.8 seconds
89.46 minutes
51.66 degrees
242.4 kilometers
264.5 kilometers
16:03:19
2
7.00 m/s
18.5 seconds
89.70 minutes
51.67 degrees
260.6 kilometers
275.5 kilometers
16:33:11
2
7.00 m/s
18.5 seconds
89.94 minutes
51.64 degrees
269.2 kilometers
297.5 kilometers

The autonomous rendezvous process was scheduled to start at 17:50:14 Moscow Time (9:50 a.m. EST, 14:50 GMT). The final maneuvering, including a flyaround of the station, a short period of station-keeping and, finally, berthing would be initiated at 19:36:10 Moscow Time (11:36 EST, 16:36 GMT).

The actual docking took place at 11:57 a.m. EST, around one minute ahead of schedule.

 

Rendezvous

Progress M-26M succeeds in boosting ISS orbit after initial failure

In early hours of May 16, 2015, just weeks after the loss of Progress M-27M spacecraft, the mission control in Korolev planned to fire engines onboard the Progress M-26M spacecraft (still docked at the International Space Station, ISS) to place the outpost into a planned orbit for the upcoming landing of the Soyuz TMA-15M spacecraft on June 11 and for the arrival of the fresh cargo ship at the beginning of July.

However shortly before the maneuver, it was aborted by the flight control computer, after it had detected that engines had not been ready.

After the review of the problem, the mission control re-scheduled the orbit correction attempt for a backup opportunity on May 18. Engines suspected of causing the initial failure were excluded from the operation, while the duration of the maneuver was extended to compensate for less thrust.

On May 18, the 1,922-second engine firing started as scheduled at 03:30 Moscow Time, boosting the outpost's altitude by 2.8 kilometers, Roskosmos announced. According to the mission control in Korolev, the average altitude of the ISS was raised by 3.2 kilometers, placing the station into a 400.76 by 417.75-kilometer orbit with an inclination 51.66 degrees and an orbital period of 92.54 minutes.

End of mission

After conducting a total of 12 orbit corrections of the ISS, Progress M-26M undocked from the aft docking port of the Zvezda Service Module on August 14, 2015, at 13:18 Moscow Time.

According to a pre-programmed sequence, the spacecraft activated its braking engine at 16:28 Moscow Time on the same day any surviving debris of the vehicle were expected to impact in the remote region of the Pacific Ocean around 17:17 Moscow Time, Roskosmos said.

The departure of the Progress of M-26M freed the aft docking post on the service module for the re-docking of the Soyuz TMA-16M spacecraft, scheduled on August 28. In turn, this operation would make that docking location available for the arrival of Soyuz TMA-18M on Sept. 2, 2015.

 

 

Total spacecraft liftoff mass
7,287 kilograms
Propellant for the integrated propulsion system, KDU
880 kilograms
Propellant in the refueling tanks
435 kilograms
Compressed oxygen in the Oxygen Supply System, SrPK
50 kilograms
Water in the Rodnik system
420 kilograms
Total mass of supplies in the pressurized cargo compartment, including...
1,465 kilograms

Gas Content System, SOGs (Pressure level indicator BID, a ventilator, sample kit AK-1M, converter EP 1903, converter GL5187, contamination filters, GA TP2286 filters)

7 kilograms

Water Supply System, SVO (capture filter; cap; hose K-G3)

96 kilograms

Sanitary and Hygiene Supplies, SGO

262 kilograms

Medical Supplies, SMO (underwear, medical check kits, hygiene and medical supplies, anti-weightlessness medications, atmosphere control and cleaning supplies)

214 kilograms

Food Provisions, SOP, (Food containers, napkins, garbage bags, fresh food)

369 kilograms

Environment control kit, KSKOS

1 kilogram

Individual Protective Gear, SIZ (Kit 825M3)

17 kilograms

Fire prevention system, SPLZ (Smoke detectors DS-7A)

6 kilograms

Thermal Control System, SOTR

41 kilograms

Onboard Equipment Control System, SUBA (HDD-disk, cables, laptop)

4 kilograms

Onboard information and telemetry system, BITS2-12

9 kilograms

Power supply system, SEP

149 kilograms

Flight Control and Navigation System, SUDN

7 kilograms

Servicing and Repair System, STOR

4 kilograms

Means of Crew Support, KSPE

40 kilograms

Instrument payloads, KTsN

14 kilograms

Means of Technical Servicing and Repair, KS TOR

3 kilograms

Hardware for FGB module

69 kilograms

Hardware for Docking Compartment, SO1 (ventilation hardware)

5 kilograms

Hardware for MIM1 module

7 kilograms

Hardware for MIM2 module

5 kilograms

US cargo for Russian crew members

68 kilograms

American cargo for Russian crew members

139 kilograms

A total mass of deliverable supplies

2,370 kilograms

 

 

Read much more about the history of the Russian space program in a richly illustrated, large-format glossy edition:

Book

 

Bookmark and Share


The page is maintained by Anatoly Zak

Last update: August 15, 2015

All rights reserved

Book

IMAGE ARCHIVE

rotation

Pre-launch processing of Progress M-26M spacecraft in February 2015. Click to enlarge. Credit: RKK Energia


fairing

Progress M-26M is covered with its payload fairing on Feb. 12, 2015. Click to enlarge. Credit: RKK Energia


arrival

Click to enlarge. Credit: RKK Energia

Pad

The rollout of the Soyuz-U rocket to the launch pad in Baikonur in the yearly hours of Feb. 15, 2015. Click to enlarge. Credit: RKK Energia


ignition

Click to enlarge. Credit: RKK Energia

flight

Soyuz rocket with Progress M-26M spacecraft lifts off on Feb. 17, 2015. Click to enlarge. Credit: RKK Energia